10 Grendon Street, North Mackay QLD, 4740
0455 290 900

Project Showcase

Delivering Excellence in Mackay, Bowen Basin, and Central Highlands

Bowen Basin Mine Site - Overhead Spillage Controls

Describe the situation
Due to recent observed audit findings indicating potential material risk hazards and ongoing hazard remediation strategies, there is a requirement to install dropped object controls at identified locations on the mine site.

Describe the problem or opportunity
Reduce the residual risk rating for a material spillage event at identified locations. Provide protection for personnel traversing underneath the nominated conveyor structures. Reopen pedestrian and vehicle access to areas restricted by demarcation.

How was it solved or captured?
Audits and assessments were undertaken by third party auditors; the audits were completed with a number of recommended controls suggested to implement dropped object or overhead spillage controls for specifically feed conveyors.

The team worked through all Operational Readiness deliverables from Contractor Onboarding to As-built Submissions to ensure all items were closed out at the completion of the project.

Distribution Board Upgrade

Appreciated the CMS Onboard team taking the time to understand the needs of the CHPP Sampler Cutter Head upgrades and reaching out to ensure the cutter was operating in accordance with the expected performance requirements.

Caval Ridge Processing

Thank you to CMS Onboard – when issuing Deliverable Acceptance Requests, they made the review process transparent and fluid. The evidence of completions and packing of deliverables allowed me to quickly approve.

Daunia Engineering

CMS Onboard | A Total Contractor Management Solution

Get in touch with us for detailed service consultation and discuss your project needs.